The Section 8 waitlist averages 27 months, and 10 to 62 depending on where you apply
HUD data show the wait for a Section 8 voucher runs from 10 months to 62 months by state. Here is how the list is ordered, how to stay on it, and what to do while you wait.
Short answer: households that got a Section 8 voucher had waited 27 months on average nationwide, according to HUD's 2025 data, but the average is 10 months in West Virginia and Wyoming and 62 months in Maryland. While you wait, apply to more than one housing agency, keep your contact details current so you are not removed, and use 211 and LIHEAP for rent and energy bills.
How long is the Section 8 waiting list in 2026?
The Section 8 waiting list averages 27 months nationwide for households that have been admitted, and 10 to 62 months depending on the state. HUD's Picture of Subsidized Households reports 2,797,793 Housing Choice Voucher units available in its 2025 data, with 2,334,114 occupied (83%), and only 7% of occupied units had moved in during the past year. That turnover is the supply: roughly 163,000 households a year (7% of 2,334,114, from a rounded percentage) are admitted into a program that, as HUD notes, has "long waiting lists" in many places.
The table below turns the averages into dates for someone applying on 24 October 2026. It is arithmetic on HUD's published averages, not a promise from any agency.
| Where you apply | Average wait (HUD, 2025) | Date the average reaches you |
|---|---|---|
| Wyoming or West Virginia | 10 months | August 2027 |
| Kentucky | 13 months | November 2027 |
| The median of 50 jurisdictions | 23 months | September 2028 |
| United States | 27 months | January 2029 |
| New York | 40 months | February 2030 |
| Maryland | 62 months | December 2031 |
The spread is not a coin toss by state size. Texas (21 months, 150,345 occupied vouchers) and California (26 months, 316,630) sit near the middle, while New York, with 247,467 occupied vouchers, averages 40 months. Small states split both ways: Wyoming is shortest at 10 months and New Hampshire second longest at 52. Averages also hide the agency level; HUD's tool can break each figure down by public housing agency, and two agencies in one state can differ widely.
What to do while you wait for Section 8
Households admitted to Section 8 had waited 27 months on average in HUD's 2025 data (HUD USER), so the useful question is what to do in those months. These steps cost nothing:
- Join more lists. HUD says you may need to apply to multiple Public Housing Agency waitlists and need not live in an agency's area to apply; find agencies in HUD's public housing contacts directory.
- Keep your place. Report address, phone and household changes, because HUD says failing to do so may get you removed (HUD); under 24 CFR 982.204(c) an agency may remove applicants who do not answer its requests.
- Ask about public housing and project-based lists. HUD says you apply for public housing through your local housing authority and that preferences affect your place in line, so ask which lists are open now.
- Dial 211 for local rent, utility and food help while your name moves up.
- Apply for energy bill help. ACF's LIHEAP page sends you to Energyhelp.us or the National Energy Assistance Referral line at 1-866-674-6327.
- If you are working, ask whether your employer or an app offers earned wage access: it lets you draw part of the pay you have already earned before payday. It is not a loan; check the fee before you use it.
How a Section 8 waiting list orders applicants
A Section 8 waiting list orders applicants by the agency's preferences first and by application time or lottery second. The federal rules fix the guardrails and leave the rest to each agency's administrative plan:
- Preferences. 24 CFR 982.207 lets an agency create local preferences "based on local housing needs" in its plan. It names optional preferences for working families, for people with disabilities and for victims of domestic violence, dating violence, sexual assault or stalking. A working-family preference must still be given to a family whose head and spouse, or sole member, is 62 or older or has a disability.
- Ties. Among applicants with the same preference status, the agency may use "date and time of application" or "a drawing or other random choice technique," which is why some agencies run lotteries.
- No jumping the line for income or size. The agency "must not select families" out of order "for the purpose of selecting higher income families" (982.207(d)), and under 982.204(d) the order may not depend on family size.
- Targeting. 24 CFR 982.201(b)(2) requires that "not less than 75 percent" of the families admitted from the list each fiscal year be extremely low income, so a very low income helps you.
Open and closed Section 8 waiting lists
A Section 8 waiting list is open only when the housing agency has announced it, and an agency may close the list once it has enough applicants for its funding. Under 24 CFR 982.206, when an agency opens a list it must "give public notice" that families may apply, and the notice "must state where and when to apply." If the list is open, the agency must accept applications from the families it is open to unless there is good cause. Once the existing list holds "an adequate pool" for the funding, the agency may stop accepting applications.
USA.gov's Section 8 page adds the practical step: check your local agency's website for reopening dates and check back, because dates change. An agency may also limit who can apply when it opens, and the notice must state that limit.
Keeping your place on the Section 8 list
You keep your place on a Section 8 list by answering every letter and telling the agency when your contact details change. HUD's voucher page warns that failing to update address, phone or household size may result in removal from the waitlist. The federal rule in 24 CFR 982.204(c) lets an agency remove applicants who do not answer requests, and it protects applicants with disabilities: if the missed response was because of the disability, "the PHA must reinstate the applicant in the family's former position on the waiting list."
CALL OR EMAIL YOUR HOUSING AGENCY "My name is ____. I applied on ____ (date) for the Housing Choice Voucher waiting list. Please confirm that I am still on the list, tell me my current status, and confirm that you have my current address, phone and household size. Which preferences are recorded on my application? Which other waiting lists, such as public housing, are open now? How will you contact me, and how long do I have to answer?" KEEP IN ONE FOLDER - Confirmation number or letter with your application date - Every notice from the agency, with the date it arrived - Photo ID, Social Security cards, proof of income and bank statements - Proof of any preference (disability, work, residency, domestic violence) - A note of each call: date, name, what was said
Section 8 waiting list scams
Anyone who asks you to pay to join a Section 8 waiting list is not a housing agency. The FTC's consumer alert on Section 8 scammers says there is no fee to register for a Section 8 waiting list, that housing authorities do not charge fees, and that they do not contact people by phone or email to push them onto a list. Fake look-alike sites collect fees and personal data; the FTC advises contacting your real housing authority, which you can find through HUD. For energy help, ACF says LIHEAP does not charge a fee for receiving a benefit and gives the HHS Fraud Hotline at 1-800-447-8477 for messages that ask for one.
Raising your odds and your income during the wait
Your odds rise with the number of lists you are on and the preferences you can document, and your finances improve if the wait is used to build income. Sister Lattice guides cover the second part: EduBracket's free online courses guide lists no-cost ways to add skills, and its career change courses guide compares paths for people moving to higher-paying work. Remember that a rising income can change which preferences and income limits apply to you, so report it to your agency as it asks.
What to do, by situation
- If you live inA 36-month-plus placeApply to agencies in shorter-wait places too, because HUD allows applying to multiple lists and the averages range from 10 to 62 months.
- If the list isClosedCheck the agency's site for the opening notice, because an open list requires public notice of where and when to apply.
- If you have aDisabilityAsk for a reasonable accommodation if you missed a letter, because the agency must restore your place when the miss was caused by the disability.
- If you areWorkingAsk whether the agency has a working-family preference, since the rule allows one.
- If rent or power isDue nowDial 211 and apply for LIHEAP, because the waiting list cannot cover this month's bill.
All 50 reporting jurisdictions, longest wait first
| State | Average months on waiting list | Occupied voucher units | Moved in past year |
|---|---|---|---|
| Maryland | 62 | 53,027 | 9% |
| New Hampshire | 52 | 10,286 | 7% |
| Delaware | 43 | 4,510 | 8% |
| Connecticut | 41 | 39,936 | 4% |
| Rhode Island | 41 | 9,154 | 4% |
| New York | 40 | 247,467 | 7% |
| New Jersey | 39 | 80,124 | 6% |
| Maine | 34 | 12,080 | 8% |
| Missouri | 33 | 36,468 | 8% |
| Oregon | 33 | 37,324 | 9% |
| Florida | 32 | 109,826 | 6% |
| Massachusetts | 31 | 92,714 | 5% |
| Michigan | 31 | 55,684 | 7% |
| Louisiana | 28 | 49,303 | 7% |
| Hawaii | 27 | 11,567 | 9% |
| Virginia | 27 | 50,810 | 7% |
| California | 26 | 316,630 | 6% |
| Mississippi | 26 | 23,774 | 8% |
| Ohio | 26 | 88,906 | 8% |
| Arizona | 25 | 23,508 | 8% |
| Minnesota | 25 | 33,538 | 10% |
| Utah | 25 | 11,662 | 12% |
| Iowa | 24 | 19,178 | 13% |
| Tennessee | 24 | 34,404 | 9% |
| Nevada | 23 | 15,671 | 5% |
| Pennsylvania | 23 | 78,218 | 9% |
| Alabama | 22 | 33,845 | 10% |
| Georgia | 22 | 54,636 | 9% |
| Illinois | 22 | 100,284 | 6% |
| Indiana | 21 | 38,351 | 9% |
| Montana | 21 | 5,743 | 14% |
| North Carolina | 21 | 54,738 | 8% |
| Texas | 21 | 150,345 | 7% |
| Wisconsin | 21 | 27,752 | 7% |
| Idaho | 20 | 6,702 | 14% |
| Colorado | 19 | 33,189 | 6% |
| Kansas | 19 | 10,705 | 13% |
| Nebraska | 19 | 11,083 | 13% |
| New Mexico | 17 | 11,108 | 6% |
| South Carolina | 17 | 25,614 | 8% |
| Vermont | 17 | 7,308 | 8% |
| Arkansas | 16 | 21,638 | 12% |
| Oklahoma | 16 | 23,586 | 8% |
| District of Columbia | 15 | 13,584 | 20% |
| South Dakota | 15 | 5,318 | 15% |
| Washington | 14 | 60,329 | 8% |
| Kentucky | 13 | 32,439 | 10% |
| North Dakota | 11 | 6,976 | 15% |
| West Virginia | 10 | 13,890 | 14% |
| Wyoming | 10 | 2,532 | 17% |
Frequently asked questions
How long is the Section 8 waiting list?
What can I do while waiting for Section 8?
Can I apply for Section 8 in more than one state or city?
How does a housing agency decide who is next on the Section 8 list?
Is the Section 8 waiting list closed?
What happens if I miss a letter from the housing authority?
Do I have to pay to join a Section 8 waiting list?
Who gets Section 8 first?
Bottom line
The Section 8 waiting list averages 27 months nationwide and varies from 10 months in West Virginia and Wyoming to 62 months in Maryland, so the most useful move is to be on several lists and to never miss a letter. Apply to the agencies you can reach, claim every preference you qualify for, and keep a folder of your documents. Use 211, LIHEAP and, if you work, a low-fee earned wage access option to cover bills in the meantime.
For the wider picture, read our housing assistance programs guide, the explainer on rental and utility assistance at the same time, how to apply for government assistance, and how long SNAP approval takes.
Related guides: benefits wait clock for every program, emergency rent help after an eviction notice, Massachusetts assistance programs guide and Colorado assistance programs guide.
How we built this page: we compiled and verified it on first-party sources read on 24 October 2026: the HUD USER Picture of Subsidized Households query tool (Housing Choice Vouchers, 2025 data, U.S. and state level), 24 CFR 982.201, 982.204, 982.206 and 982.207 on the eCFR, HUD's voucher tenant and public housing pages, USA.gov, the FTC alert, and ACF's LIHEAP page (sources linked inline). The finding is our own arithmetic on HUD's published figures; the date table adds HUD's average months to 24 October 2026 and is an illustration. HUD's wait figure covers households already admitted, so it understates the wait for people still on a list. We did not apply to any agency; this is not legal advice, and your housing authority decides your place.